We design water retention measures and constructed wetland wastewater treatment systems that use natural filters and plants to purify wastewater. It is an environmentally friendly solution for locations without a sewerage system. Contact us.

Implementation
We focus on water retention measures and worry-free implementation of constructed wetland wastewater treatment plants for our customers. We are here to deliver efficient and eco-friendly solutions while taking care of the entire construction and maintenance process.

Service
We offer comprehensive service for each of our green solutions and water retention measures. We care about your comfort. We are here to ensure the trouble-free operation of your solutions.

Inspection
We perform inspections of small wastewater treatment plants (WWTP) up to 50 population equivalent (PE). An inspection is a mandatory check and verification of the equipment's technical condition and functionality carried out once every 1–2 years by a certified inspection technician.

ESHOP
Products
Cost comparison
Why a root sewage treatment plant is worth more than a septic tank and an activation treatment plant
Konkrétne čísla, ktoré hovoria jasnou rečou. Porovnajte si sami a rozhodnite sa na základe faktov, nie odhadov.
Annual operating costs
Žumpa je finančná pasca. Priemerná štvorčlenná rodina naplní žumpu za 4 až 6 týždňov. Jeden vývoz stojí 80 až 150 € v závislosti od lokality. Ročne to znamená 8 až 12 vývozov, čiže 600 až 1 200 €. Koreňová čistička odpadových vôd vodu čistí priamo na mieste a vypúšťa do prostredia. Ročné náklady sú len servisná prehliadka za 60 až 120 €. Za desať rokov prevádzky ušetríte 5 000 až 10 000 € v porovnaní so žumpou.
Total cost over 10 years
Celková investícia do koreňovej čističky odpadových vôd ECOKOCKA vrátane montáže a projektu je 4 550 až 5 350 €. Žumpa za rovnaké obdobie stojí 8 584 až 15 184 € (vrátane obstarania a vývozov). Rozdiel v počiatočnej investícii je len 1 500 až 2 100 € a zaplatí sa za 3 až 5 rokov. Životnosť koreňovej čističky odpadových vôd je 20 až 30 rokov, takže potom šetríte ďalších 15 až 25 rokov. Nehnuteľnosť s koreňovou čističkou má navyše vyššiu trhovú hodnotu.
Worry-free operation
Bežná ČOV si vyžaduje 1× týždenne prevádzkovú kontrolu, priebežné dopĺňanie baktérií a 1× týždenne kontrolu kalu. K tomu spotrebúva 365 až 730 kWh ročne, čo je 100 až 200 € za elektrinu, plus baktérie za 50 až 100 € ročne. Koreňová čistička funguje gravitačne bez čerpadla a kompresora. Baktérie v koreňoch rastlín sa rozmnožujú samé, nemusíte ich kupovať ani doplňovať. Žiadne mechanické časti, žiadne náhradné diely, žiadne prekvapenia na faktúre.
Natural process in 4 steps
How does a root sewage treatment plant work
Bez elektriny, bez chemikálií, bez vášho zásahu. Celý proces čistenia odpadových vôd prebieha prírodnou cestou.
Mechanical pre-treatment in a septic tank
Biological treatment with bacteria
Root filtration by plants
Discharge of treated water
From order to launch
How is the installation of the waste water treatment plant
4 kroky od prvého telefonátu po bezstarostné fungovanie vašej domovej čistiarne.
Free consultation
We will identify your needs and recommend the most suitable type of wastewater treatment plant. Free of charge and without obligation.
Project and permits
Documentation and permit processing. We know the requirements of every district. We will arrange everything for you.
Treatment plant installation and start-up
Complete installation of a wastewater treatment plant including excavation, septic tank, filter, and planting. We will fill it, start it up, and provide training. Full performance of the domestic wastewater treatment plant within 1 month.
Service and inspection
24-hour service and telephone consultation.
Real experiences
What our customers are saying
Rodiny z celého Slovenska, ktoré prešli na koreňovú čističku odpadových vôd.
Scroll with arrows for more reviews
Answers to your questions
Frequently asked questions about wastewater treatment plants
Show 5 more questions
Získajte bezplatnú konzultáciu a kalkuláciu
Zistite, koľko presne ušetríte s čističkou odpadových vôd oproti vašej súčasnej žumpe alebo septiku. Naši odborníci vám do 24 hodín pripravia nezáväznú cenovú ponuku na mieru vrátane kalkulácie návratnosti investície. Stačí nám zavolať alebo napísať.
+421 918 742 738Complete guide
Waste water purifier ECOKOCKA
Kompletný systém koreňovej čističky odpadových vôd pre rodinné domy. Bez baktérií, bez starostí. Jeden ekvivalentný obyvateľ predstavuje dennú produkciu 150 litrov odpadovej vody. ECOKOCKA pohodlne pokryje štvorčlennú až šesťčlennú rodinu.
Who is ECOKOCKA for
From a small family house to a municipality with 2,000 PE. Ideal for homeowners without access to public sewerage, as well as for holiday cottages and cabins where conventional treatment plants fail due to irregular wastewater inflow. ECOKOCKA covers the entire spectrum — from the smallest installations to municipal and community projects.
Maintenance and winter operation
A root-zone wastewater treatment plant requires minimal maintenance. An annual service inspection, sludge is pumped out once every 1 to 2 years, and plants are cut back once in the autumn. Our root-zone treatment plant can also handle regular cleaning detergents — it is not a limitation as with conventional activated sludge plants. It works reliably even in winter. Our installations in Liptov handle temperatures down to minus 15 °C.
WWTP versus cesspool versus septic tank
A root-zone wastewater treatment plant purifies at 90 to 95% with operating costs of 60 to 120 EUR per year. Over 10 years: WWTP 5,150 to 6,550 EUR, cesspool 8,584 to 15,184 EUR. Clearly the most cost-effective choice.
Detailed guide
Waste water purifiers for family houses in Slovakia
Kompletný prehľad v siedmich bodoch pre každého, kto zvažuje koreňovú čističku.
Why households switch to a reed bed treatment plant
A domestic wastewater treatment plant is a one-off investment that pays for itself within a few years. Cesspool emptying prices are rising, and municipalities are tightening inspections. The Water Act requires proof of legal sewage disposal. Fines reach up to three times the fee.
Right size
One PE = 150 liters per day. For 4 to 6 people, the 6 PE model. Slight oversizing can handle visitors. An oversized wastewater treatment plant for a small household will not function properly; the bacteria will die off without enough nutrients.
Constructed wetland versus conventional
A conventional WWTP requires electricity for the blower. During a power outage, the bacteria die off. The ECOver version operates gravitationally completely without electricity (requires sloped terrain). The ECOkocka version uses minimal electrical consumption for the blower. Both are constructed wetlands — lower costs, longer lifespan, no chemicals, and no need to replace bacteria.
What the price includes
The total investment in a constructed wetland wastewater treatment plant ECOKOCKA including installation and project design is EUR 4,550 to 5,350. A cesspool costs EUR 8,500 to 15,000 over 10 years. A constructed wetland amounts to EUR 5,150 to 6,550 over the same period — including operation and maintenance.
Permits step by step
Project design, hydrogeological assessment, application (EUR 33), final inspection approval. It takes 2 to 4 months. As part of the turnkey treatment plant service, we take care of everything for you. We communicate with the authorities; you just sign.
Most common concerns
A constructed wetland does not smell, is quiet, and works year-round. Wastewater (15 to 20 °C) warms the substrate. Gravel provides insulation. In Liptov, they work even at minus 15 °C. Odor, noise, cold — these are just myths.
Why choose ECOPLANET SLOVAKIA
Firma z Gôtovian špecializovaná na koreňové čističky odpadových vôd. Stovky realizácií po celom Slovensku. Osobný prístup ku každému projektu. Zavolajte na+421 918 742 738 alebo napíšte na info@ekocisticky.sk.
Practical information
What you should know before buying a sewage treatment plant
Odpovede na otázky, ktoré si kladie každý, kto zvažuje prechod zo žumpy na koreňovú čističku.
What kind of plot you need
ECOkocka requires an area starting from just 3 m² — we introduce it as the smallest root-zone treatment plant on the market. ECOver requires an area from 6 m². For a complete set (with connection, septic tank, planting), a slightly larger area is needed. ECOver requires sloped terrain for gravity-flow mode, whereas ECOkocka works on flat land as well. We will assess the groundwater level and exact dimensions during a free site inspection.
Lifespan and reliability
A plastic septic tank lasts 40 or more years. A reed bed filter has no mechanical parts that could break down. Gravel does not decompose, and plants regenerate. Compare this to a conventional biological treatment plant, where the blower lasts 5 to 8 years and costs €200 to €400. With a reed bed treatment plant, these expenses do not exist.
Treated water and its use
The outlet water meets statutory limits. You can use it to irrigate lawns, flower beds, and fruit trees. It is not drinking water, but it is excellent for everything in the garden. In the summer, when drinking water is the most expensive, you will save tens of euros more each year on tap water consumption.
What must not end up in a wastewater treatment plant
Chlorine-based bleach (Savo), aggressive cleaners, paints, thinners, and motor oils. Common eco-friendly dishwashing, laundry, and floor cleaning detergents are completely fine. Standard toilet paper decomposes without issues. Wet wipes and sanitary products do not belong in a wastewater treatment plant.
Wastewater treatment plant and property value
A house with a functioning wastewater treatment plant is more attractive on the real estate market. Buyers know how much it costs to operate a cesspool. In addition, the reed bed filter complements the garden. Wetland plants bloom from spring to autumn, creating a habitat for butterflies and dragonflies. Aesthetics that a cesspool can never offer.
Subsidies and financial support
A reed bed wastewater treatment plant is cost-effective even without a subsidy. The Environmental Fund of the Slovak Republic announces annual calls to support water supply and sewerage infrastructure. Subsidies are primarily intended for municipalities, not individuals. However, some municipalities purchase treatment plants for their residents. Inquire at your local municipal office.
Your security
Why trust ECOPLANET SLOVAKIA
Každá čistička odpadových vôd od nás je krytá zárukou a celoživotnou podporou.
150+ installations
Hundreds of satisfied families all across Slovakia. We addressed every project individually, from the site inspection to final approval. We know the conditions in every region and know what works in practice.
10-year warranty
wastewater treatment plants We provide a ten-year warranty on structural components. If anything happens, we will repair it at our expense. No excuses and no hidden terms.
Lifetime support
We won't abandon you after installation. Service hotline, annual inspections, audits for authorities, and consulting anytime during its lifespan. One partner for the entire lifespan of your reed bed system.
All of Slovakia
We install waste water purifiers all over Slovakia
Poznáme podmienky v každom regióne. Typ pôdy, hladinu spodnej vody, požiadavky okresných úradov. Kde ste vy, tam sme aj my.
Get started today
Get a non-binding quote for a sewage treatment plant
Vyplňte formulár a do 24 hodín vám pripravíme ponuku na mieru vrátane kalkulácie návratnosti. Alebo nám jednoducho zavolajte.